午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
已經翻譯3:水泥攪拌樁試驗樁施工方案(宋友開)(8頁)
已經翻譯3:水泥攪拌樁試驗樁施工方案(宋友開)(8頁).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:475379 2022-07-22 7頁 63KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、 水泥攪拌樁試驗樁施工方案Pile Test Construction Plan of Cement Mixing Pile 一、原理 I. Principle and Theory 水泥攪拌樁是利用水泥作為固化劑的主劑,通過攪拌樁機將水泥噴入土體并充分攪拌,水泥與土發生一系列物理化學反應,使軟土硬結而提高路基強度。水泥攪拌樁是軟基處理常見的有效方法。Cement mixing pile, an effective way to soft treatment, which adopts cement as the main host of curing agent, insert cement2、 into soil body through mixing pile machine, to improve the strength and intension of sub grade in the source of soft soil hardening by a serious physical and chemical reaction. 二、試驗段里程 Sections of test 確定試驗段里程為DK12+773DK12+833。It was confirmed that the test section from DK12+773-DK12+833.三、工程概況 The3、 brief condition of project DK12+673DK12+833段軟土路基分布在丘間谷地中,該段地形平坦,表層主要為流塑-軟塑狀黏土,灰色、灰黑色,含有機質,土質不均,含少量細砂顆粒;下伏可塑硬塑狀砂黏土。采用水泥土攪拌樁復合地基加固,樁徑0.5m。DK12+673-DK12+833 located in valley between hills, soft sub grade, with plat and smooth land form, the top soil is gray and gray-black fluid plastic clay, containi4、ng organic materials and few fine sand dust, underlying waxy and hard plastic sand clay. Adopting cement mixing pile to harden foundation, dimension of pile is 0.5m. 四、設計參數 Designation parameter. 1、試驗樁位置:DK12+803DK12+833。 Location of test pile: DK12+803-DK12+833.2、樁長:根據設計圖紙確定為5m。Length of pile: 5m a5、s indicated in drawing.3、樁徑:500 mm;樁底穿透軟土至硬底層不小于1.0m。Dimension of pile: 500 mm;pile bottom through soft soil to hard bottom as least 1.0m.4、水泥摻入量:按室內配合比進行試樁,水泥用量在35kg/m、40kg/m、45kg/m、50kg/m、55kg/m中進行比選,進行室內配合比試驗,每種配合比現場施工試樁2根。 Insert quantity of cement: according to indoor ratio to test pile, the qu6、antity of cement comparison and selection from 35kg/m, 40kg/m, 45kg/m, 50kg/m, 55kg/m, to perform indoor mix ratio test, 2 piles need to be performed for every mix ratio. 5、無側限抗壓強度值:28d無側限抗壓強度值不小于1.2Mpa。 Non lateral confinement pressure resistance value: the non lateral confinement pressure resistan7、ce pressure (28d) should higher than 1.2 Mpa.6、攪拌樁復合地基承載力:符合設計要求。 Load of mixing pile composite foundation: as per the designation requirements.五、試樁目的 Target of pile test. 通過試驗樁研究樁體水泥土強度與齡期的關系,找出最佳的水泥用量、水泥漿的水灰比、攪拌次數、噴漿次數;確定泵送壓力、攪拌機提升速度、下鉆速度和復攪深度等技術和工藝參數。試樁結束后及時整理資料,形成試驗樁總結報告,報請業主工程師審批,以便指導水泥攪拌樁的施工。 8、To find out the optimal cement content, water cement ratio of cement past, mixing and guniting times, and confirm the pumping pressure, lifting speed of mixer, speed of drilling, depth of re-mixing, and other technical and technological parameters. Sorting data and materials timely after pile test f9、inished, write the pile test final report, and submit to engineer of client for approval, in order to guide the cement mix pile construction. 六、施工準備 Construction preparation 1、場地處理:清除施工場內的雜物、積水以及地表植物,平整場地。 Site clearance: Clear the sundries, pondings and top soil plant in side, site leveling. 2、樁位布置10、:用全站儀、測量尺及拉線定出每根樁的樁位,并做好標記。Pile layout: to confirm and mark pile location by total station instrument, survey tape and lining.3、對機具設備進行組裝和調試。 Assembling and debugging to equipment.4、電力采用發電機組。Generator set as the source of power. 七、人員、設備安排 Human resource and equipment arrangement 試驗樁段具體由項目三分部負責,項目三分部11、總工程師任試驗組組長,工程部長、試驗室主任任組員;組建1個施工班組,由6人組成,具體分工見下表:The pile test was responsible by third branch of project, the chief engineer appointed as the leader of the test group, project officer, test office leader appointed as the member of the group, establish one construction group, madding up 6 persons as 12、following, 操作人員分工 Operator division 序號SerialNo. 工種Position人數Numbers工作內容Job duties 1機長Commander1負責現場指揮協調 site coordination and commanding 2操作員Operator 1正確操縱攪拌機的下沉、提升、噴漿和停漿等,檢查和維修機械 Mixer sinking, lifting, guniting and stop pasting, checking, maintenance and repairing to equipment3司泵Pumping charge1負責灰13、漿制備和泵送,做好水泥漿設備的檢修保養Mortar preparation and pumping, checking maintenance and repairing to cement mortar and past equipment 4上料工Material load labor1將水泥送入罐內,保證施工連續Put cement into tank, keep construction performing continuously 5電工Electrician1保證電力機械設備正常安全使用Keep safety and regular work of electrical equi14、pment 6記錄員Recorder 1負責記錄數據,操縱電器控制儀表,使用聯絡信號,兼質量檢查工作Data recording, electrical control instruments operating, connection, and quality inspection八、試樁工藝要求 Pile test technological requirements攪拌樁施工工藝流程:施工準備樁機對位漿液制備鉆進至樁底設計深度噴漿、攪拌、提升鉆頭至設計樁頂標高(停止噴漿) 復攪至樁底深度噴漿、攪拌、提升鉆頭至設計樁頂標高(結束噴漿)檢查成樁記錄質量成樁結束。Mixing pile con15、struction technological process: Construction preparationPile pre-positioncement past preparation drilling into the designed depthguniting, mixing, drilling bit lifting to elevation of pile block (stop guniting) re-mixing to the depth of pile bottomguniting, mixing, drilling bit lifting to designed 16、elevation of pile block(stop guniting) checking the quality of pile finishpile finish。1、施工測量放樣。測量人員用全站儀放線,配合鋼尺、拉線丈量、定位。攪拌機定位對中。Construction survey and layout. Surveyor fix position by total statin instruments with steel tape, and lining. 2、制備水泥漿。采用普通硅酸鹽水泥,按水灰比0.450.55拌制水泥漿。Cement past preparation. M17、ix cement past on the water cement ratio of 0.45-0.55, using Portland cement.3、鉆進攪拌。鉆頭正向旋轉,實施鉆進作業,攪拌樁機下沉速度控制在1.62.0m/min。Drilling and mixing. Rotating the drilling bit directly, the drilling speed should be controlled during 1.6-2.0m/min.4、噴漿提升攪拌。鉆進噴漿至設計樁長后,為保證漿噴樁樁端質量,原地噴漿不小于30秒,再反轉勻速提升。噴漿攪拌提升速度擬定為018、.81.0m/min。攪拌頭自樁底反轉勻速攪拌提升直至地面,并噴漿。Gunited lifting and mixing. Drilling and mixing to the length of designed pile, in order to insure the quality of pile end, guniting on the spot at least 30 seconds, and then lifting reversely in an uniform speed. The guniting mixing speed proposed be 0.8-1.0m/min. 19、Mixing and lifting mix head to land in a uniform speed and reversely, and guniting.5、清洗,加入適量清水,清洗管路中的殘漿和攪拌頭上的軟土。 Cleaning and washing: wash and clean the remaining past inside the pipes and soft soil on the mix head. 6、鉆具提升地面后,鉆機移位對孔,按上述步驟進行下一根樁的施工。 After lifting the mixing equipment to land, move d20、rill and check position, to perform construction of next pile as above process.九、試樁的質量檢驗 Quality inspection of test pile1、試驗過程中記錄各試驗參數,填寫各參數配對表:即水泥用量、水灰比、攪拌次數、噴漿次數、泵漿壓力、攪拌下鉆速度、攪拌提升速度和復攪深度等。Record parameter in the course of test, fill parameter tables: cement content, water cement ratio, mix times, g21、uniting times, pumping pressure, mixing drilling speed, mixing lifting speed and remixing depth and so on.2、成樁28天后,采用輕便觸探試驗檢驗承載力,鉆芯取樣檢測無側限抗壓強度。 28 days later of the pile finished, to check and examine the load by light sounding, to test the no lateral confinement pressure resistance. 十、試樁總結報告 Final 22、report of pile test 撰寫試驗樁總結報告。通過試驗樁過程中收集的各種技術數據,進行統計比選,選擇既能滿足設計技術指標又經濟適用的施工參數作為攪拌樁施工的依據。Write pile test final report. Comparision and selection to the data in the course of pile test, choose the construction parameter which meet the design index and economical as the basis of mix pile construction.
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 2024”造氧音樂節“夏季潮流音樂節游園會主題活動策劃方案-46頁.pptx
  2. 防洪防汛常識及自救知識培訓課件(31頁).pptx
  3. 花園小區高層公寓施工組織設計方案(134頁).doc
  4. 現代農業科技中試孵化基地建設項目可行性研究報告99頁.doc
  5. 工程項目工地現場施工車輛進出檢查及管理規定.doc
  6. 防洪防汛安全工作指南及自救知識培訓課件(34頁).pptx
  7. 夏季防汛安全知識培訓課件(20頁).ppt
  8. 水系綜合整治工程北岸親水棧道施工組織設計方案(121頁).docx
  9. 廠房屋面網架工程制作、安裝工程施工組織設計方案(73頁).doc
  10. 歷山路危房改造工程施工組織設計方案(151頁).doc
  11. 廠區雨水管道、污水管道、天燃氣管道施工組織設計方案(111頁).doc
  12. 商場施工組織設計方案(52頁).doc
  13. 東寧縣老城區集中供熱新建熱源項目煤棚鋼結構網架工程施工組織設計方案(55頁).doc
  14. 住宅小區配電室安裝、電纜敷設施工組織設計方案(226頁).docx
  15. 廠區水泥混凝土路面施工方案(20頁).doc
  16. 80MW風電項目升壓站土建施工工程施工組織設計方案(56頁).doc
  17. 路基工程施工方案、施工方法(73頁).doc
  18. 砌筑檢查井施工方案(78頁).docx
  19. 上海市嘉定區總體規劃暨土地利用總體規劃方案(2017-2035年)(213頁).pdf
  20. 上海市金山區總體規劃暨土地利用總體規劃方案(2017-2035年)(151頁).pdf
  21. 頂管工程施工組織設計方案(83頁).doc
  22. XX市現代農業科技中試孵化基地建設項目可行性研究報告136頁.doc
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  8. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  9. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  10. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  11. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  12. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  13. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  14. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  15. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  16. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  17. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  18. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  19. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  20. 河南省西平縣國土空間總體規劃方案(2021-2035年)(公示版)(37頁).pdf
  21. 水泥混凝土路面工程專項施工方案(17頁).doc
  22. 建筑工程公司資料員取證培訓課件(307頁).ppt
主站蜘蛛池模板: 蒙阴县| 柳河县| 定结县| 哈密市| 怀柔区| 大庆市| 莱西市| 伊川县| 岢岚县| 马尔康县| 青阳县| 蓝田县| 晋城| 郎溪县| 台前县| 宁蒗| 平湖市| 永川市| 读书| 平度市| 嘉定区| 长白| 靖宇县| 黔西| 镇原县| 克拉玛依市| 乌拉特前旗| 桐梓县| 隆子县| 衡山县| 通江县| 永登县| 奎屯市| 沿河| 容城县| 兴安盟| 游戏| 华宁县| 曲靖市| 呼图壁县| 巧家县|