1、摘 要南昌至德昌高速公路D4標(biāo)段工程是國家重點(diǎn)公路江西公路的重要組成部分,該施工組織設(shè)計(jì)是指針對(duì)本公路工程項(xiàng)目,在開工前針對(duì)工程本身特點(diǎn)和工地具體情況,按照工程的要求,對(duì)所需的施工勞動(dòng)力、施工材料、施工機(jī)具和施工臨時(shí)設(shè)施,經(jīng)過科學(xué)計(jì)算、精心對(duì)比及合理的安排后編制出的一套在時(shí)間和空間上進(jìn)行合理施工的戰(zhàn)略部署文件。主要內(nèi)容包括編制依據(jù),編制原則,工程概況,施工準(zhǔn)備工作總計(jì)劃,施工總進(jìn)度計(jì)劃、資源配置計(jì)劃,主要工程施工方法、施工工藝以及各種保證措施等主要內(nèi)容,編制出針對(duì)性的施工組織設(shè)計(jì),每個(gè)分部分項(xiàng)工程的特點(diǎn)、結(jié)構(gòu)特征、施工難易程度工期和質(zhì)量要求,編制出切實(shí)可行的施工方案,以指導(dǎo)施工并順利地完成本工
2、程項(xiàng)目的建設(shè),控制工程成本,創(chuàng)建優(yōu)質(zhì)工程。關(guān)鍵詞:施工組織設(shè)計(jì) 總進(jìn)度計(jì)劃 工程特點(diǎn) 施工方案AbstractThe D4 project of Nanchang to Dexing highway is a key national highway Jiangxi an important part of highway. the construction organization design mean to aim at engineering item in this highway and aim at an engineering characteristics and workp
3、lace concrete circumstance before starting work, according to the request of engineering, to the construction labor force needed, start construction material, start construction temporary facilities of machine tool and construction, after science calculation and with meticulous care contrast and rea
4、sonable of arrangement after draw up a set of strategic deployment document that carries on a reasonable construction on time and space of .The main contents includes to draw up basis, draw up a principle, engineering general situation, start construction to prepare to work to totally row, start con
5、struction total progress plan and resources allocation plan, the main engineering starts construction method, start construction main contentses, such as craft and various assurance measure.etc., draw up to aim at a sexual construction organization design, the characteristics of each cent parts of i
6、tem engineerings, structure characteristic, start construction the difficult easy degree work expect to request and draw up a practical viable construction project with quality, with instruction construction combine successfully completion originally the construction of the engineering item, control engineering cost, establish high-quality engineering.Keyword:The construction organization designs;total progress plan ;engineering the characteristics start;construction project